Dripta Roy

I lead digital transformation: the processes, platforms and teams that help organisations build the right things faster.

Transformation and operations leader with a design background. Eleven years at LEGO and Grundfos, from company-wide ways of working and portfolio management to AI, new capabilities and growing leaders.

Red Dot Design AwardiF Product Design Award
Grundfos iSOLUTIONS Suite
Red Dot 2024
iF Design Award 2025
2,000+people in 100+ teams using processes I co-led
1,000+hours saved per digital project with a new delivery model
+20%above target on the overall cost, time and quality KPI in 2025
8people grown into senior and lead roles

Selected work

8 case studies

How I run operations

Habits, with examples
Start readyNo work starts without clear requirements, a success measure and confirmed resources. I introduced a Definition of Ready for exactly this reason.
Make decisions clearDecisions stall when nobody knows who owns them. A simple RASCI for budgets, priorities and platform choices ends the waiting.
Gate with evidenceProjects pass a gate when the business case, the customer need and the technology are ready, checked against a shared checklist.
Make risk visibleA weekly traffic-light report to senior stakeholders, built with the delivery manager, so problems surface while they are still small.
Measure and adjustShared KPIs for cost, time and quality, and goals set from what the team tells me is blocking them.
Fix the sourceMost delays start before a project does. I would rather fix the process upstream than manage the symptoms downstream.
People first, then mission, then goals.

People development is my strongest suit. I lead with trust and empathy, hire for potential and give people a safe place to stretch. Over eight years, eight people in my teams have grown into senior and lead roles, and I have led leaders since 2020.

I set clear long-term goals and let the team decide how to get there. I do not micromanage. I am available when people need me, and I review direction with each lead every month.

Growing people and organisations

  • Built a team from 4 to 24 designers across Denmark and China, and led it through 5 leads.
  • Created two new career paths at Grundfos: the platform designer and the business designer.
  • Set up a new competency in customer insights that the divisions have since taken in-house.
  • Moved from results-first to people-first leadership. Hitting a goal alone does not count as success.
Case study · Grundfos

Running the portfolio

Many projects, a fixed team and priorities that kept changing. My job was to decide what we worked on, keep delivery on track, and make risks visible early.

Role
Accountable for budget, priorities and delivery of my area
Budget
11M+ DKK a year
Partners
Operations lead, delivery manager, divisions

The challenge

Work arrived without clear requirements, priorities shifted mid-project, and people were moved between projects at short notice. Projects ran late, teams worked in silos, and nobody had one view of the whole portfolio.

What we did

PrioritiesSet portfolio priorities in a regular planning cycle, with my operations lead steering capacity and resources.
RiskBuilt a traffic-light risk report with the delivery manager: one template, regular alignment and a weekly update to senior stakeholders.
ReadinessIntroduced a Definition of Ready and clear decision rights, so work starts with what it needs.

I also proposed a project management office for digital development, to drive projects across silos rather than inside them.

The result

+20%above target on the overall cost, time and quality KPI in 2025

Risks were reported every week in the same format, so senior stakeholders could act on them early.

← All work
Case study · Grundfos

Building new capabilities

Transformation needs more than new processes. It needs the right people in the right roles. At Grundfos I built new functions and career paths that the company has since made its own.

Role
Head of the design platform; leader of leaders since 2020
Growth
From 4 to 24 designers in under four years
Locations
Denmark and China

The challenge

Grundfos was strong at engineering how to build things, but weaker at deciding what to build. Designers worked project by project, and customer insight had no clear home.

What we built

Customer insightsA new competency in research and anthropology, including a research hub, focused on what to build, not only how.
Business designersA role new to Grundfos that sharpens requirements with architects before development starts.
Platform designersA role that owns shared experiences across products, instead of one project at a time.

I organised the team around five leads, each owning an area: design operations, UX architecture, platform delivery, the design system and business design.

The result

8people grown into senior and lead roles

The divisions have taken the insights competency in-house, and the business designer role is becoming permanent in the solutions and marketing areas.

← All work
Case study · LEGO

Botanical element platform

LEGO wanted adult builders to create flowers, plants and trees. That needed new elements that could read as leaves and branches, work in the hundreds, and be made from renewable plastic.

Role
Drove the development of the platform
Company
LEGO Group, Denmark
Outcome
Basis of the Botanical Collection

The challenge

A botanical model can use hundreds of leaf and branch elements. Each one has to look natural, fit the LEGO system, and never clash with the elements around it. Existing parts could not do that.

What we did

We designed a platform of flexible elements built on three principles.

Ease of buildingEvery other LEGO element fits on the surface, so builders can combine freely.
Creative pushOne clean design mimics leaves and branches, and can be used in the hundreds without overlap.
SustainabilityDesigned for renewable plastic instead of ABS from the start.

The result

50M+pieces produced a year, as evergreen elements

The platform has since grown with new elements and is the basis of the LEGO Botanical Collection, including sets such as Flower Bouquet and Bonsai Tree.

← All work
Case study · LEGO

Digital building instruction app

As part of LEGO's digital transformation, we saw a large drop-off among young builders. My team set out to find out why, and to design an app that helped every child finish their model.

Role
Led a team of 3 UX/UI designers and a creative lead
Platforms
iOS and Android
Partners
LEGO's 3D team, who turned each model into a digital asset

The insight

What we saw

A large drop-off in builders aged 5 to 8.

What we found

Parents often bought sets above the recommended age.

What we did

Designed digital help so children of all ages could keep building.

We could not control which sets parents bought. We could make the building experience work for the child holding the box.

What we did

My team specified the digital building instruction experience: searching for a set, saving a collection, and stepping through each build in a way that suits younger builders. We worked closely with the 3D team that turned each LEGO model into a digital asset for phone and tablet.

The result

+30%engagement in searches for LEGO
+35%retention among young builders

At the time, it became LEGO's most downloaded app for children.

← All work
Case study · Grundfos

Grundfos Design System

When I joined Grundfos in 2018, there was no shared design language for its digital products. Every project designed and coded its own screens. I made the case for a design system, got it prioritised, and built the team that runs it.

Role
Envisioned it, secured the investment, lead the team
Scope
Phone, web and desktop, and embedded displays on pumps
Recognition
Used in Red Dot-winning products

The challenge

Digital was becoming central to Grundfos' strategy, but each division built its apps on its own. The result was an inconsistent experience across touch points, and the same features designed several times over. Designers in projects focused on their project, so nobody owned the whole.

What we built

We built the Grundfos Design System from the ground up: one shared library of components, patterns and guidelines that every digital team can use.

One system, three surfacesSmartphone, web and desktop, and the small embedded displays on the pumps themselves.
Platform experiencesCommon flows such as software update, setpoints and sensor setup, designed once for every product.
Design to codeMoved to Figma and reusable React components, with an internal portal open to everyone in the company.

How we govern it

A system only works if people use it. We set up platform design leads for each product family, trained the designers in every division, and ran a design community where platform and divisional designers share work.

The function has a clear mandate: KPIs for reuse and compliance, a review of user interfaces at the final development gate, and the right to block designs that break the guidelines.

Range

The same system carried very different products. It gave the industrial monitoring platform its dark interface, adapted to the expectations of users in China for a city flood-monitoring system, and supported both light and dark modes for the homeowner app from one set of assets.

The result

2international design awards: Red Dot 2024 and iF 2025

The connected iSOLUTIONS Suite won a Red Dot award for user interface design, where I am credited with the Grundfos China team, and an iF Design Award. The design system is now used across Grundfos' digital products, including MAGNA, SCALA1 and MIXIT. My team is testing GDS Studio, an AI proof of concept that turns design system assets straight into working code. In our team survey, the design system was the work people were most proud of.

The team holding the Red Dot certificate at the 2024 Brands and Communication Design awardsThe team at the iF Design Award 2025 ceremony
Collecting the Red Dot Award 2024 and the iF Design Award 2025 for the iSOLUTIONS Suite, with the Grundfos team.
← All work
Case study · Grundfos

Customer insights platform

Grundfos talked to customers all the time, but what it learned sat in scattered folders. My team built the company's first insights platform, so customer evidence could be found, trusted and reused.

Role
Initiated it and led the team that built and rolled it out
Partners
The PLM department and every division
Outcome
Company-wide standard for customer evidence

The challenge

Weak documentationEvidence was not linked to the decisions it informed. The customer's own words got lost.
Repeated researchDivisions kept rediscovering the same things, at real cost.
Missed scaleResearch quality had grown, but the results stayed in silos.

What we built

We set up a shared platform, built on Dovetail, with one way of tagging and describing research. Interviews, field visits, sales notes and trade-show observations go in as raw material. They are structured, turned into insights for a domain, and finally into global insights that hold across divisions.

Capture

Low-effort ways to add evidence from research, sales and the field.

Curate

Shared metadata, so evidence is findable and every insight traces back to its source.

Connect

Insights feed product requirements and decisions, and the PLM system.

Adoption

We trained every division and took the platform from a pilot to company infrastructure. It is now moving to IT as a standard tool, with an insights manager proposed in each division so the divisions own their own use.

The result

298research projects and 6,141 data items since January 2025
597insights created across the company by the end of 2025

The platform is being integrated into Grundfos' PLM system, linking what customers need to what gets built.

← All work
Case study · Grundfos

Idea-to-Market

Projects at Grundfos often lost time because work started before anyone was sure what to build. I co-led the design of a company-wide stage-gate process that fixes problems at the source, and led its rollout.

Role
Co-led the design; led pre-development and the rollout
Reach
2,000+ people in 100+ teams across 10 disciplines
Partners
Project management office, architects, divisions

The challenge

Requirements arrived at the start of development unclear or incomplete. Teams waited on each other, reworked what others had built, and documented in different ways. It was hard to trace a feature back to the customer need behind it.

What we did

We defined one reference model from strategy to phase-out, with clear gates and what each gate needs. Before development starts, a project must show readiness on three fronts: the business case, the customer need, and the technology.

Pre-development

Validate business, customer and technology readiness. Business designers sharpen requirements with the architects.

Development

Requirements broken down from system to element level, built and verified feature by feature.

In life

Learning from real-world use feeds the next release.

How we rolled it out

With the project management office, we modelled the new process, redefined the development gates, updated the templates and gate checklists, and trained technical and business product owners. I sat on the leadership team that ran the gate reviews.

We also moved from SAFe to a dual-track delivery model, so discovery and delivery run side by side and software, hardware and design work the same way.

The result

1,000+hours saved per digital project with the new delivery model
+20%above target on the overall cost, time and quality KPI in 2025

Business designers, a new role at Grundfos, are now becoming permanent in the solutions and marketing areas.

← All work
Case study · Grundfos

AI in delivery

I have worked on AI at Grundfos from two sides: getting AI products into customers' hands, and using AI to change how we build. Both start with real user problems and clear rules for responsible use.

Role
Interim Head of AI Solutions, 2023–2024; now lead AI in digital development
Team
12 data scientists and engineers
Partners
Group Management, divisions, technology teams

AI products

As interim Head of AI, I set priorities for the AI portfolio, introduced Scrum and brought UX into AI development. The aim was simple: solve real customer problems, not run experiments for their own sake. Use cases included predicting sewer overflows, estimating flow in water networks and finding leaks.

I secured a two-year extension of the strategic AI budget from Group Management, beyond my own time in the role. I also argued that AI and UX belong together, and Grundfos is adopting that model from 2027.

Responsible use

With Group Management, I helped put Grundfos' first AI policy and guidelines in place. For R&D, the standard sets out which tools are approved, when a proof of concept needs sign-off, and how we measure speed, quality and cost.

AI in how we build

Map the processLead the work to map where AI can make core development processes more efficient.
Close the gapsPilot AI agents that trace each requirement from customer need to delivery.
Design to codeGDS Studio, a proof of concept that turns design system assets straight into working code.

The result

8+AI pilots taken into production

The agent pilots and GDS Studio are still running. I will share results as they come in.

← All work